40-Year Recertification

Completed

September 2026

Metal Fabrication Facility

Doral · Miami-Dade County
Metal Fabrication Facility, 10877 NW 33rd St, Doral, FL 33172: project photo 1 of 5Metal Fabrication Facility, 10877 NW 33rd St, Doral, FL 33172: project photo 2 of 5Metal Fabrication Facility, 10877 NW 33rd St, Doral, FL 33172: project photo 3 of 5Metal Fabrication Facility, 10877 NW 33rd St, Doral, FL 33172: project photo 4 of 5Metal Fabrication Facility, 10877 NW 33rd St, Doral, FL 33172: project photo 5 of 5

Building type

Industrial / fabrication facility

Size

1 building

15,137 sq ft (adjusted)

Year built

1996

Stories

1

Completed

September 2026

Overview

This one-story metal fabrication facility at 10877 NW 33rd St in Doral produces roofing panels and trim. Built in 1996, the 15,137 sq ft building came due for recertification under Miami-Dade County's 40/50-year program. The filing followed the Miami-Dade 40 year recertification process, part of Miami-Dade County building recertification.

Because it is a working plant, we inspected the structural and electrical systems around the production floor on August 18, 2026, including infrared thermography of the electrical equipment and the parking lot lighting. Our licensed Professional Engineer signed and sealed the reports for the City of Doral.

How it works

  1. Inspection in 2–5 days

    A licensed engineer inspects the structural and electrical systems.

  2. Sealed report within 48 hours

    Signed and sealed by a Florida Professional Engineer.

  3. Filed with your building department

    Your report goes to the building department for your recertification.

Metal Fabrication Facility: questions and answers

Can a Doral fabrication plant keep running during recertification?

Yes. At 10877 NW 33rd St we inspected the structural and electrical systems around the production floor on August 18, 2026, while the plant kept making roofing panels and trim.

Why was thermography included at the Doral facility?

The plant’s 700 A electrical service is above Miami-Dade County’s 400 A threshold for infrared thermography.

How quickly were the Doral reports submitted?

Nine days after the inspection: the plant was inspected on August 18, 2026, and the reports went to the City of Doral on August 27, 2026.

What did the City of Doral receive?

Signed-and-sealed structural and electrical reports and a parking lot illumination certificate for the 15,137 sq ft building, built in 1996.

Got a notice for your building?