Building type
Church
Size
1 building
24,042 sq ft
Year built
1966
Stories
Completed
November 2026
Overview
This church campus at 150 NW 46th Ave in Plantation combines the steepled sanctuary with long wings around a central lawn, all on a site of about 5.6 acres. The 24,042 sq ft building dates to 1966, which put it on the schedule for the Broward County Building Safety Inspection Program (BSIP). At 60 years old, the church falls under the 50 year recertification Broward County requires.
A licensed Professional Engineer inspected the structural and electrical systems on October 22, 2026. The signed-and-sealed BSIP reports were prepared for the City of Plantation.
Photo gallery
Photos
How it works
Inspection in 2–5 days
A licensed engineer inspects the structural and electrical systems.
Sealed report within 48 hours
Signed and sealed by a Florida Professional Engineer.
Filed with your building department
Your report goes to the building department for your recertification.
Church: questions and answers
How long does Plantation take to review a BSIP recertification?
For this church, the reports were submitted to the City of Plantation on October 27, 2026, and approved on October 29, 2026.
Why was a 1966 church in Plantation on the 50-year cycle?
At 60 years old, the 24,042 sq ft church building at 150 NW 46th Ave falls under the 50-year recertification Broward County requires.
When was the church campus inspected?
On October 22, 2026. A licensed Professional Engineer inspected the structural and electrical systems of the sanctuary and its wings on the site of about 5.6 acres.
How much does a BSIP inspection cost for a church in Plantation?
It depends on the size of the campus and its buildings. Our pricing page explains how we price BSIP inspections for churches and other large buildings.
See pricing →Got a notice for your building?
Send it over and get a proposal the same business day.








