5-star rated on Google

City of Miami Building Recertification

Got a 40-year recertification notice from the City of Miami? Our licensed Professional Engineer inspects the structure and electrical systems, signs and seals the reports, and files them with the City through iBuild for you. Send your notice and get a fixed-fee proposal the same business day.

  • Inspection in 2–5 days; sealed report within 48 hours
  • Filing with the City of Miami included
  • One re-inspection included · no rush fees
Florida PE #85427Verify license on DBPR
Illustrated Miami skyline with the Freedom Tower, downtown towers and palm trees

Miami · Miami-Dade County

Issued by the City of Miami

“The process is now complete and the building is granted re-certification.”

Request your proposal — takes 30 seconds

Property address and email is all we need. Fixed-fee proposal the same business day.

PDF, JPG or PNG, up to 10 MB. A phone photo of the letter is fine.
Uploading your notice…
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.

By submitting, you consent to receive a one-time proposal email or call. You won't be added to any marketing list. See our Privacy Policy.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Google review

Chris

Property owner, Miami

“We hired Mimik Solutions for the 40-year recertification of our warehouse in Miami. The entire process was smooth, communication was great, and everything was handled professionally. Would definitely recommend them to other commercial property owners.”

How it works

  1. Inspection

    We schedule the structural and electrical inspection within 2–5 days.

  2. Signed and sealed report

    Engineering reports formatted to the City of Miami's exact submission requirements, signed and sealed within 48 hours of the inspection.

  3. Submission

    We file the completed reports through the City's iBuild and ProjectDox portals and respond to City review comments related to the original inspection scope.

Miami recertification pricing, posted up front.

Every City of Miami building recertification is a fixed fee, quoted before you commit, with no hourly creep.

*Pricing depends on building size, number of structures, electrical service characteristics, available documentation and City of Miami requirements. Thermography, where required, and the City's $276 filing fee are separate.

Small commercial or multifamily building

From $2,500

4–10 units or comparable commercial building

$3,500 – $5,500

11–40 units or multiple-building property

$5,500 – $9,500

Large or complex property

Custom proposal

Multiple buildings

Portfolio pricing available

Recent projects in Miami

Buildings we have inspected and recertified with the City of Miami.

See all projects →
Storage WarehouseStorage WarehouseStorage Warehouse

Storage Warehouse

Address: 21 NW 11th Terrace, Miami, FL 33136

Completed November 2026

Miami · Miami-Dade County

Warehouse BuildingWarehouse BuildingWarehouse Building

Warehouse Building

Address: 23 NW 11th St, Miami, FL 33136

Completed October 2026

Miami · Miami-Dade County

Multifamily PropertyMultifamily PropertyMultifamily Property

Multifamily Property

Address: 1125 NE 80th St, Miami, FL 33138

Completed September 2026

Miami · Miami-Dade County

How building recertification works in the City of Miami

Miami follows the Miami-Dade County building recertification program (County Code Section 8-11(f)). Many owners still call it the 40 year recertification, but today the first recertification is due at 30 years, or 25 years for qualifying coastal buildings, and every 10 years after that.

First recertification

30 years

25 for qualifying coastal buildings; then every 10 years

Report due

90 days

from the notice date; $500 for each three-month extension, maximum of two

Repair permit

60 days

after the report is submitted, to pull a repair permit without a violation

City review

6 weeks

for a completion letter or a list of changes

Who runs it

City of Miami

  • Handled by the Unsafe Structures Section of the Building Department, 444 SW 2nd Ave, 4th Floor
  • Run under Miami-Dade County Code Section 8-11(f)
  • The City notifies the owner when the building comes due

Which buildings

30 years or older

  • 25 years for qualifying coastal buildings, then every 10 years
  • The 10-year clock runs from the date the building was due, not the date it was recertified
  • Exempt: single-family homes, duplexes, and buildings of 2,000 sq ft or less with an occupant load of ten or fewer

Filing and city fee

iBuild · $276

  • Application opened in the City's iBuild portal; reports uploaded in ePlan/ProjectDox
  • Files named to the City's convention (RC-S, RC-E, RC-C, RC-PHO) and digitally signed
  • $276 City filing fee, invoiced in iBuild. Pay it directly, or we pay and you reimburse us. See pricing

What we handle

Inspection through filing

  • Structural and electrical reports, plus the parking lot illumination letter, the parking lot guardrail certificate and thermography where required
  • Signed and sealed cover letter and reports uploaded for you; City review comments answered
  • One re-inspection with an amended report if repairs are needed

From the City's notice to the completion letter

The two letters every City of Miami owner sees: the one that starts the clock, and the one that closes the case.

Start · What you receive

Notice of required recertification

Sent by the City of Miami Building Department when the building comes due.

What it asks for

  • Structural and electrical recertification reports within 90 days of the notice date
  • Signed and sealed by a Florida Professional Engineer or Registered Architect, with a cover letter and recommendation
  • Parking lot illumination and guardrail certificates, where they apply
  • Uploaded through iBuild and ProjectDox, with the City's $276 filing fee

If the deadline passes

The City can open a building violation, and the violation fees must be paid before the building is recertified. An unresolved case can move to unsafe-structure proceedings.

Finish · What you get

Completed Recertification of Buildings

A letter from the City of Miami Building Official once the reports and fee are received and reviewed.

“The process is now complete and the building is granted re-certification.”

From a City of Miami completion letter for one of our reports, September 2026

  • The building is recertified, with the next one due in ten years
  • The ten-year period starts from the date the building was due, not the date it was recertified

Miami recertification: questions and answers

Is it still the 40 year recertification in Miami?

The name is. The rule changed: under Miami-Dade County Code Section 8-11(f), a City of Miami building is first recertified at 30 years, or 25 years for qualifying coastal buildings, and then every 10 years. The ten years are counted from the date the building was due, not the date it was recertified.

How long do I have after the City of Miami sends my notice?

90 days from the date of the notice to submit the signed and sealed structural and electrical reports. If you need more time, email the City for an extension before the due date. Under the City’s fee schedule, each additional three-month extension is assessed $500, with a maximum of two possible extensions after the original notification letter. Reports can also be filed early, up to two years before the building’s recertification year.

How do reports get filed in Miami?

Online. The application is opened in the City’s iBuild portal and the reports are uploaded in ePlan/ProjectDox, named to the City’s convention and digitally signed. We do the filing for you. The City answers within about six weeks with a completion letter or a list of changes. The City charges a $276 filing fee, invoiced through iBuild, which is separate from our price.

See city fees on our pricing page →
What if the inspection finds repairs on my Miami building?

The report is submitted first, before any repairs start. That gives you 60 days to obtain a permit for the repairs without a violation. Once the permitted work is done, we re-inspect the noted areas and issue the amended report—one re-inspection is included in our fee—and the building can then be recertified.

Which Miami buildings don’t need recertification?

Single-family homes, duplexes, and buildings of 2,000 sq ft or less with an occupant load of ten or fewer are exempt. If you think your building is exempt, the City reviews exemption requests by email and answers within about four weeks.

My notice deadline is close. Do you charge extra to hurry?

No. There are no rush fees—tell us your deadline and we prioritize it at no extra charge. You get a fixed-fee proposal the same business day, inspection in 2–5 days, and the signed and sealed report within 48 hours. A 50% deposit when you sign starts the work, and the balance is due when the report is filed.

See city fees on our pricing page →

Got a notice for your Miami building?

Send it over and get a fixed-fee proposal the same business day.

Get a proposal