A licensed Florida PE explains what drives the price of a Broward Building Safety Inspection, how it compares with Miami-Dade recertification, and what the cities charge to file.

Short answer: For most buildings, a Broward Building Safety Inspection Program (BSIP) inspection with a signed and sealed structural and electrical report has a typical range of about $2,000 for a small building up to $3,000 to $9,000 for typical multifamily and commercial properties, and most of our recent projects fall into that range. Large or complex properties are quoted individually. That is a bit less than a comparable Miami-Dade recertification, because Broward's program has fewer add-on requirements: no infrared thermography for 400-amp-plus electrical services, no parking lot illumination certification, and no parking lot guardrail certification.
Below is where that number comes from, what the city adds on top, and what no inspection quote includes.
Both counties run the same kind of program: a structural and an electrical safety inspection, documented in a report signed and sealed by a Florida-licensed engineer or architect, repeated every 10 years. If you have read our Miami-Dade 40-year recertification cost guide, the basic cost drivers will look familiar.
The difference is what each county asks for on top of the core inspection.
Miami-Dade requires three items that Broward does not:
All three are part of the Miami-Dade recertification packet (Miami-Dade Recertification page). Each one means extra field time, extra documentation, and in the case of thermography, a specialist with their own equipment.
Broward's current inspection guidelines, the "General Considerations & Guidelines for Building Safety Inspections" that are part of BORA Policy #05-05, cover the structural system and the electrical system (service, switchgear and branch circuits, raceways, fire alarm, emergency lighting) but do not include a thermography scan or the parking lot certificates. No Broward city requires thermography, a parking lot illumination certificate or a parking lot guardrail certificate for a BSIP report. Guardrails and railings on the building itself, including in parking garages, are still inspected as part of the structural review.
Less scope means less time on site and a shorter report, so BSIP fees run a bit lower for a comparable building.
| Broward BSIP | Miami-Dade Recertification | |
|---|---|---|
| Structural inspection, sealed report | Required | Required |
| Electrical inspection, sealed report | Required | Required |
| Infrared thermography (400 A+ service) | Not required | Required |
| Parking lot illumination certificate | Not required | Required where applicable |
| Parking lot guardrail certificate (lots next to water) | Not required | Required where applicable |
| First inspection | 25 years after certificate of occupancy | 30 years (25 near the coast) |
| Repeats | Every 10 years | Every 10 years |
| Report deadline | 180 days from receiving the notice | 90 days from the notice |
| Repair window | 180 days from the report date | Set by the building official |
| Counts as the state milestone inspection | Yes (BORA Policy #05-05) | Separate requirement for qualifying condos |
| Typical range, small building | From $2,000 | From $2,500 |
| Typical range, small multifamily | $3,000 – $5,000 | $3,500 – $5,500 |
| Typical range, mid-size or multi-building | $5,000 – $9,000 | $5,500 – $9,500 |
| Large or complex property | Custom proposal | Custom proposal ($15,000+ for high-rises and garages) |
Fee rows show the typical range for our fixed-fee proposals; most of our recent projects fall into these ranges. They match the pricing on our BSIP and Miami-Dade recertification service pages. The size bands differ slightly between the two pages (BSIP uses 4–10 and 11–40 units; Miami-Dade uses 2–15 and 15–50 units), so read the comparison as approximate.
For the full list of rule differences between the counties (age triggers, exemptions, deadlines and condo disclosure), see Broward vs. Miami-Dade: Key Differences.
Even without the Miami-Dade add-ons, no two Broward buildings cost the same to inspect. These are the factors that move the number when we quote:
Building size and number of structures. More square footage, more units and more buildings mean more field time. A garden-style complex with ten separate buildings is ten structural and electrical inspections, even if each building is small.
Stories and threshold status. For a threshold building (more than three stories or taller than 50 feet), BORA Policy #05-05 requires the structural portion to be prepared by a structural engineer licensed as a Special Inspector. Taller buildings also have more balconies, façade elements and roof equipment to inspect.
Occupancy and use. A warehouse with one electrical room is quick; a mixed-use building has more meters, panels and life-safety systems to check.
Electrical service. Thermography isn't required in Broward, but the electrical report still has to describe the service and evaluate switchgear, branch circuits, raceways, the fire alarm and emergency lighting. Multiple services, meter centers and electrical rooms add time.
Balconies, decks, garages and seawalls. BORA's policy specifically includes elevated decks, balconies, and docks and seawalls attached to or supporting a structure, and says parking garages and guardrails are not exempt. Each one adds inspection scope.
Access. Locked electrical rooms, roof hatches without keys and units we can't get into all lead to return visits. Coordinated access on inspection day is the cheapest way to keep the fee where it was quoted.
Documents and plans. Original drawings, permit history and the last 40-year or BSIP report shorten the inspection. Missing records mean more field verification.
Visible condition. A building with active spalling, cracking or corrosion takes more documentation and photographs, and the report has to describe the extent of the deterioration and the repairs needed.
The inspection fee goes to the engineer. Separately, your city charges its own fee when the report is submitted. In Broward, BORA sets the countywide rules, but each municipality administers the program, so fees vary by city. Published examples:
For comparison, unincorporated Miami-Dade charges an initial review fee of $413.61 for structural and electrical review, effective October 1, 2026 (Miami-Dade Recertification page). Note that some Broward cities charge per building, so a multi-building property pays the filing fee more than once. Check your city's building department page or ask us when you send your notice.
Repairs. If the inspection finds problems, BORA gives the owner 180 days from the date of the report to complete the repairs, unless the building official sets a different timeframe, and repairs generally need permits. Repair costs depend entirely on what is found. Our Miami-Dade cost guide explains the typical repair buckets, and they apply in Broward too.
Good news on re-inspection. Once repairs are done, BORA requires the engineer who did the original inspection to re-inspect the noted areas and issue an amended report with a signed and sealed letter stating the repairs are complete. If your building needs that re-inspection, it is included in our original proposal. You will not get a second bill for it.
City fees and extensions. City filing fees are paid to the city, not to us. If you need more time, the building official can grant an extension of up to 60 days to submit the report.
What our fixed fee does include: the structural and electrical inspection, the signed and sealed report on Broward's BORA forms with photos, submission, responses to city review comments on the original inspection scope, and the re-inspection and completion letter if repairs are required.
Under BORA Policy #05-05, buildings are due when they reach 25 years from the certificate of occupancy, then every 10 years from the year the first inspection was required. Single-family through four-family dwellings with three or fewer habitable stories, fee simple townhouses and minor structures under 3,500 square feet are among the exemptions. Cities mail notices by certified mail between June and August. The timeline then runs in two steps:
For condominiums and cooperatives, a Broward BSIP inspection also counts as compliance with the state milestone inspection (both phases) under §I.E of the policy, so you are not paying for two inspections. In Miami-Dade, qualifying condominiums follow the milestone process alongside recertification; our milestone vs. recertification guide explains how the two fit together.
The first 180 days sound like plenty, which is why owners wait. Starting in month five turns a routine inspection into a rush job and eats into planning for any repairs. The notice is the right time to call an engineer, and our guide to what to do after you receive a recertification notice walks through the first steps.
Send us your BSIP notice through the proposal form on our Broward BSIP page. You will get a fixed-fee proposal the same business day, and we flag anything about your building that could affect cost or scope at no charge. Once you approve, we schedule the inspection within 2 to 5 days and deliver the signed and sealed report within 48 hours of the inspection. Own several buildings in Broward or Miami-Dade? Mention all of them and we will quote them as one proposal. For general questions, use our contact page.
How much does a Broward BSIP inspection cost in 2026?
The typical range runs from about $2,000 for a small building to $3,000 to $9,000 for typical multifamily and commercial properties, for the structural and electrical inspection with a sealed report. Most of our recent projects fall into that range. City filing fees and any repairs are extra.
Why is a BSIP inspection cheaper than a Miami-Dade recertification?
Broward does not require infrared thermography for 400-amp-plus electrical services, a parking lot illumination certificate, or a parking lot guardrail certificate. Less scope means less field time and a shorter report.
How much is the city filing fee in Broward?
It depends on the city. Fort Lauderdale charges $375, Hollywood $300, and Pompano Beach $350 per building or structure. Check your city's building department for the current fee.
Does the inspection fee include repairs?
No. Repairs and their permits are separate, and you have 180 days from the report date to complete them unless the building official sets a different timeframe. If a re-inspection is required after repairs, it is included in our original proposal.

Both counties replaced the old 40-year recertification after Surfside, but they did it differently. Age triggers, deadlines, exemptions, and report forms all change at the county line.

A real breakdown of what a 40-year recertification costs in Miami-Dade in 2026.

This guide walks you through exactly what to do, step by step, written by a licensed Florida Professional Engineer.
Ranges help with budgeting, but your building deserves a real quote. Send your BSIP notice through our Broward proposal form and get a fixed-fee proposal the same business day. If a re-inspection is needed after repairs, it is included.